Inverter-door collision
Confirmed door interference. Stops release until the closed-door envelope is corrected.
Sample Build-Readiness Report / public web preview
A public sample of a cabinet build-risk review: one confirmed door-interference blocker, evidence gaps, build/RFQ scope, and first-article checks before spend turns into rework.
Confirmed inverter-door interference blocks release until CAD and evidence gaps are closed.
Correct the inverter-door collision in CAD before an internal build, fabrication quote, panel-build quote, or first article.
Gate E-01 fails by production evidence, not visual suspicion.
Schematic, terminal schedule, wire list, ratings, enclosure target, and FAT plan are still missing.
Fix CAD first, then close the questions that affect wiring, ratings, substitutions, and first-article/FAT.
Limited intake: STEP/PDF/BOM evidence plus one production note. Only build-blocking evidence gaps are called out.
| Input category | Status | Used for | Report effect |
|---|---|---|---|
| STEP assemblies | Received | Geometry, cabinet envelope, deep component placement, protruding features. | Enough to route the manufacturability review and identify clearance risks. |
| Mechanical and electrical installation PDFs | Received | Cabinet layout, BOM items, DIN rail components, glands, hinges, inverter location. | Supports physical-risk review, make/buy split, and build-loop scope. |
| Production note | Defect | Door does not close because the inverter hits the door. | Overrides weak visual evidence and drives the executive decision. |
| Electrical schematic, wire list, terminal plan | Evidence gap | Panel build quote, continuity testing, labeling, field troubleshooting. | Creates a pre-release evidence request before panel build. |
| NEMA/IP, SCCR, UL label expectation | Evidence gap | Enclosure rating, component substitution, UL508A path, build qualification. | Must be confirmed before internal builders or suppliers assume environment or compliance scope. |
Build-readiness checks separate physical blockers from internal/supplier questions and evidence requests.
| Gate | Status | Evidence | Decision |
|---|---|---|---|
| E-01 closed-door clearance | Blocker | Production fact: the inverter interferes with the closed-door envelope. | Correct CAD before prototype/internal build or supplier review/RFQ release. |
| E-02 inverter cooling and service | High risk | Inverter sits near a guard/screen; manufacturer clearance evidence not supplied. | Verify clearance, airflow, and service access. |
| E-03 door open position and service access | High risk | Hinges visible; no hold-open feature found. | Add or verify positive hold-open. |
| E-04 wiring, wire ducts, and tool access | High risk | Dense PG21 glands and 25 x 25 mm duct; fill/tool access unproven. | Check duct fill, circuit separation, and tool access. |
| E-06 electronics board standoffs | Medium risk | Power board present; standoff size/retention not confirmed. | Prefer M4; require retention evidence if M3 remains. |
| E-07 electrical documentation and marking | Needs evidence | Schematic, terminal schedule, wire list, and marking method missing. | Define docs before panel build or supplier review/RFQ release. |
| E-08 electrical FAT/test plan | Needs evidence | Point-to-point, ground, insulation, and functional test plan missing. | Add FAT checklist to Build-06 and panel-build scope. |
| E-10 enclosure protection and cable entry integrity | Needs evidence | NEMA/IP target, gland rating path, gasket, and environment unknown. | Confirm rating before quoting cable-entry assumptions. |
Four issues drive the build-risk decision and next-loop scope.
Confirmed door interference. Stops release until the closed-door envelope is corrected.
Add a retainer so service work does not depend on holding the door by hand.
Confirm manufacturer clearance, airflow path, and guard removability.
Prefer M4. If M3 is unavoidable, require pull-out and torque-out evidence.
Sequence after blocker correction.
Confirm STEP, drawings, BOM, rating, SCCR, and site envelope.
Fix door collision, add retainer, verify wired clearance.
Define the enclosure, panel, wiring, finish, procurement, and FAT scopes for internal builders or suppliers.
Compare assumptions, exclusions, inspection, test plan, ownership, and readiness to build.
Build one corrected article before scaling parts, wiring, labels, or batch release.
Run door, clearance, ground, point-to-point, and function tests.
Separate workstreams reduce mixed assumptions for both internal build teams and outside suppliers.
| Work package | Owner / supplier type | Scope to define | Output needed |
|---|---|---|---|
| Build-00 CAD correction | Internal engineering or contract ME/EE | Resolve collision, update CAD/drawings/BOM, add door stay, check cooling clearances. | Redline list, revised STEP/PDF, owner, and release check. |
| Build-01 enclosure fabrication | Internal shop or sheet-metal fabricator | Cut, bend, weld or fasten cabinet parts, install inserts, hinges, door stay, guard, and finish prep. | Build method, inspection plan, deviations, and handoff evidence. |
| Build-02 panel build | Internal electrical team or UL508A-aware panel shop | Populate DIN rail, mount inverter, breakers, contactors/starters, relays, terminals, wire and label cabinet. | Wiring assumptions, test plan, label path, substitutions, and release blocker list. |
| Build-03 harness and wiring kit | Internal build team or harness/box-build supplier | Precut labeled wire set, harnesses, ferrules or lugs, optional subassemblies. | Wire list basis, test method, release assumptions, and open evidence. |
| Build-04 finish/coating | Internal finish route or finishing subcontractor | Powder coat, paint, anodize, passivation, masking, grounding-point protection, silk screen if needed. | Prep method, coating thickness, masking plan, grounding protection, and acceptance check. |
| Build-06 first article / FAT | Internal QA, selected supplier, or third-party inspector | Mechanical inspection, door close/open test, electrical test, photo report. | Pass/fail criteria, photo evidence, and unresolved issue list. |
Recommended actions before the next spend-heavy build loop.
Ask for a sample output or send a short non-confidential note. We will reply with the intake checklist.
A paid Build-Readiness Sprint is customized to your files, build context, tolerances, and release deadline.
Do not send raw confidential CAD/BOM through this public form. Use a sanitized example or transfer files after NDA/SOW.
AssemblyRoute AI turns CAD, drawings, BOMs, and build notes into focused build-risk decision packages before teams spend on prototype, internal build, supplier review/RFQ, first article, FAT, or pilot build.
Outputs include practical corrections, open evidence, internal/supplier questions, first-article checks, build-loop scope, and bounded preliminary load/deformation sanity checks when scoped.